As my clients, I will email you detailed updates about your condominium, including construction photos, on a regular basis. For this website, I will only post limited construction photos (2 pictures per updates) to save web space.

February 2012 – More work interior work are still underway at Tower I (2 photos on left) such as tiles are now being installed along hallways and elevator lobby on 9th and 10th floors, installation of unit bathroom fixtures and balcony door at the 9th floor.  Tower II (right photo) is now on 28th floor; also a second safety catch was installed in 20th floor, and on the 17th floor pre-cast column cladding are installed.

Grand Midori Makati

Tower I exterior

Grand Midori Makati

Hallway tile installation at 9th Floor Tower I

Grand Midori Makati

Tower II construction now at 28th Floor

.

.

.

.

.

November 2011 – Internal works (wiring, piping, unit partitions, finishing) are still ongoing on Tower I (left photo).  From the outside, all the windows were all installed.  Tower II (right photo) is now on 15th/16th level, way passed the parking and amenity floor from my previous photos.

The Grand Midori Makati

Tower I

Grand Midori Makati Construction Updates

Tower I and Tower II

.

.

.
.

.
.
.
..

May 2011 – Construction reached the 38th floor last month, the top most floor in Tower I.  There was a Topping-off Ceremony last month attended by Federal Land executives.  Tower II construction is at parking level.

The Grand Midori Makati in Legaspi Village Makati CityThe Grand Midori Makati in Legaspi Village Makati City

.

.

.

.

.

February 2011 – These are construction photos taken at The Grand Midori Makati.  The left picture is a photo of Tower I, construction is currently in 30+ floor while Tower II on the right picture is currently at the Podium/Parking Level.

construction photos of grand midori makaticonstruction photos of grand midori makati.

..

..

.

F.